Site C Hydroelectric Dam – High Precision Monitoring

Comprehensive aerial inspections and photogrammetric analysis of winter spillway gate operations

Project Snapshot

Category Details
Client BC Hydro
Project Name High Precision Monitoring
Location Fort St. John
Date 2023 – 2026

Project Overview

Introduction

Following completion of BC Hydro’s Site C Earth Filled Dam near Fort St. John, BC, Underhill was engaged to deliver a high-precision monitoring program to track structural behaviour during and after reservoir filling.

The project involved monitoring 73 monitoring points across the dam with millimetre-level accuracy, requiring a robust and carefully designed control network capable of maintaining precision over time and under changing conditions.

Project Challenges

Delivering consistent, high-accuracy monitoring on this project required overcoming a range of environmental and operational challenges:

  • Extreme seasonal temperatures ranging from +30°C to -40°C
  • Dust, heat shimmer, strong winds, and ice fog affecting visibility and instrumentation
  • Frosted prisms and variable GNSS reliability due to solar activity
  • Ongoing construction and evolving site conditions
  • Seismic events, including two earthquakes during the monitoring period

Underhill’s Approach

Underhill designed a monitoring solution anchored by a rigorously tested and adaptable control network. A pre-analysis using least squares adjustment initially proposed three primary control points, but this was expanded in response to field conditions—resulting in a network of 13 densified control stations for improved reliability.

The approach integrated complementary technologies and verification methods:

  • GNSS observations for primary positioning control
  • Trimble SX10 scanning total station for conventional measurements
  • Precise levelling between all of the primary control to act as a independent verification of GNSS measurements
  • Monitoring frequency was strategically adjusted to align with project phases, increasing from monthly to weekly and up to twice-weekly observations during critical reservoir filling periods.

Noteable Outcomes

  • Successful monitoring of 73 monitoring points with consistent millimetre-level precision
  • A resilient and adaptable control network that performed reliably in extreme conditions
  • High-confidence data supporting dam performance evaluation during and after reservoir filling
  • Improved field efficiency and data processing through optimized monitoring workflows
  • This project was the recipient of a 2026 David Thompson Award for Challenging Non-Cadastral Project

Technical Highlights

  • Pre-analysis and Least Squares Adjustment used to optimize network design and performance
  • Control network expanded from 3 planned stations to 13 densified stations
  • Independent verification through precise levelling across all primary control points
  • The GNSS, robotic total station and levelling measurements were all processed with MicroSurvey’s StarNet Least Squares Adjustment software.
  • GNSS accuracy achieved within 5–10 mm, with conventional measurements within 3–5 mm of control
  • To strengthen the network of monitoring stations prisms, we included 20 Leica 360 prisms to allow for conventional ties from multiple primary control stations.
  • Field productivity and office processing efficiency was substantially increased by introducing Trimble Access’s Monitoring module

Project Impact

Underhill’s monitoring program provided critical, high-precision data to support the safe filling and ongoing performance assessment of a major hydroelectric dam.

By delivering reliable results under extreme environmental and operational conditions, the project demonstrates Underhill’s ability to design and implement resilient geomatics solutions for complex infrastructure, supporting long-term asset performance and risk management.