Total Station
Underhill Geomatics is supporting the Fraser River Tunnel Project through topographic surveys, construction layout, as-built surveys, and monitoring services, helping advance one of British Columbia’s most significant transportation infrastructure projects.
Provided survey control, construction layout, LiDAR scanning, and legal surveying services for Phase 1 of the Burnaby Hospital Redevelopment Project.
Transforming the former Western Speedway site, Langford Heights Business Park is a major mixed-use development in Langford, BC. Underhill Geomatics provided legal, environmental, UAV LiDAR, and construction surveying services to support subdivision planning, infrastructure design, and ongoing construction.
Comprehensive aerial inspections and photogrammetric analysis of winter spillway gate operations
Comprehensive aerial inspections and photogrammetric analysis of winter spillway gate operations
Underhill installed a real-time total station to monitor shaft wall movement during the Second Narrows Water Tunnel TBM lift.