17 Oct BC Hydro Transmission Line Surveys
Posted at 10:58h
in
Like the previous decade, numerous transmission line surveys were conducted for BC Hydro throughout BC – Mica Dam, Downey Dam Site, Revelstoke, and McGregor Reservoir Mapping. Work was completed at Peace River sites C and E, Kootenay River Diversion, Columbia River Revelstoke Project, McGregor River, Duncan River, Iskut, Liard, and Stikine and Skeena Rivers.
(Pictured: D. LaPaturel on rim of Stikine Canyon, BC Hydro Stikine Investigation, 1978)