Ruby Creek Mineral Lease Survey

  • During GPS Survey of mineral lease. Ruby Cr., Atlin, BC.

  • During GPS Survey of mineral lease. Ruby Cr., Atlin, BC.

  • During GPS Survey of mineral lease. Ruby Cr., Atlin, BC.

  • GPS Survey of mineral lease. Ruby Cr., Atlin, BC.

  • GPS Survey of mineral lease Ruby Cr., Atlin, BC.

  • Standing on mountain at Ruby Creek Mineral Lease Survey

  • Grassland at Ruby Creek Mineral Lease Survey

  • Surveying setup at Ruby Creek Mineral Lease Survey

  • Amazing view Ruby Creek Mineral Lease Survey

  • Scenery at Ruby Creek Mineral Lease Survey

  • Aerial view Ruby Creek Mineral Lease Survey

  • First Cell Claims Plan done under the Mineral Tenure Act (BC). By F.C. Underhill, 2006.

  • Mineral lease Ruby Cr., Atlin, BC.

  • Keeping warm at Ruby Cr., Atlin, BC.

  • Carrying survey equipment at Ruby Cr., Atlin, BC.

    During GPS Survey of mineral lease. Ruby, Cr., Atlin, BC.

  • GPS Survey of mineral lease Ruby Cr., Atlin, BC.

  • GPS Survey of mineral lease Ruby Cr., Atlin, BC.

  • Carrying equipment at GPS Survey of mineral lease Ruby Cr., Atlin, BC.

  • GPS Survey of mineral lease Ruby Cr., Atlin, BC.

  • Mountain view at Ruby Creek Mineral Lease Survey

  • Mineral lease survey Ruby Creek, Atlin, BC.

  • Mineral lease survey Ruby Creek, Atlin, BC.

  • Underhill team at Mineral lease survey Ruby Creek, Atlin, BC.

  • Chris El-Ajaj at Mineral lease survey Ruby Creek

  • Taken at Ruby Creek, Atlin, BC.

    GPS Survey of Mineral Lease, Ruby Cr.

  • Aerial view of Atlin, BC. During Ruby Cr. Mineral Lease survey, 2005.

Date
About This Project

Underhill was contracted to do a mineral lease survey on claims at Ruby Creek near Atlin, BC. Under the supervision of F.B. Underhill, the project became the first mineral lease done using the (then) new geographic cell system as opposed to the traditional unit, or location line, claims. The claim was surveyed using a combination of real-time kinematic and static GPS. Trimble R8 receivers were used on the survey.